New World Cromwell

Project: New World Cromwell Enabling Civil Works

Client: Foodstuff South Island

Date: October 2024 - April 2025

Description:

Strata Civil was engaged to deliver the enabling civil works for the New World Cromwell extension.  

Scope of works included: 

  • Insitu Concrete retaining wall construction along with an acoustic fence on top to reduce the car park noise for nearby residents. 

  • Drainage installation within site and within Waenga Drive. This included working with existing AC pipes and other services, as well as carefully planned water shutdowns and wastewater diversions 

  • Bulk earthworks to remove existing infrastructure and re-grade the new access road and reserve. 

  • Pavement construction for a new raised table in Waenga Drive, new access road into the carpark, renovated carpark and new pathways throughout site and the upgraded reserve. 

  • Delivery of a freshly upgraded landscaped reserve, including new street furniture, pathways, decorative poles and lots of planting. 

This project demanded a high level of planning and execution, particularly around live traffic environments, integration with existing infrastructure and working with stakeholders. Strata Civil’s team worked closely with Whitestone Contracting as a key subcontractor to assist delivering this large package of works.